Things I will complete before 2/28/06

By 2/28/06 I will complete the following:

–Book Stuff–

–Acting Stuff–

  • Purchase Backstage on Thursday 2/2/06 (completed: 2/3/06) – Did this Friday instead of Thursday.
  • Send out headshots/resume for parts I’d be right for (week of 2/2/06) (didn’t complete this)

–Music Stuff–

  • Email C., re: get together on Thursday afternoon (2/2) for guitar hang (completed: 2/1/06) – update: This week’s no good for him. Possible follow-up next week. (update: 2/9/06) I got together with C. this afternoon.

–Home Stuff–

  • Follow up with apartment mgr., re: Credit (completed: 2/1/06) – I’ll get the credit on my March rent. It’s the credit I was expecting and I should be able to purchase the paint as well as a few other home items with it.
  • Call the apartment mgr., re: Have them fix the toilet (completed 2/3/06) – The sewer and water guy came and took the tank apart and found the blockage. What a hoot.
  • Call the super, set up appt. to hang the closet doors (completed 2/3/06) – He’s supposed to come first thing Monday morning. (update: 2/6/06) See my post here. Ridiculous.
  • Paint the Burgundy wall (mostly complete: I put a couple of coats the burgundy wall but had issues with the paint. I need to wash off any dust on the wall and try another coat. Moving the completion of this one forward.)
  • Touch up the remaining white areas that need it in the back LR (completed when my folks were here)
  • Touch up (paint) the area around the back LR radiator (completed 2/28/06)
  • Assemble the Expedit bookshelf (completed 2/4/06 – Thanks M.! : )
  • Put the back LR furniture back where it belongs (out of the front LR) (completed)
  • Research and find the best and/or cheapest raw materials for the “window framing” project (completed: 2/8/06)
  • Purchase the raw materials for the window framing project (completed: 2/8/06)
  • Assemble the “window framing” project (paint and attach the frames to window) (completed)
  • Purchase a 3 foot display ledge for burgundy wall (probably from Pottery Barn) (move forward – I have a two foot ledge that I may or may not use. Will make a final decision before next weekend)
  • Visit fabric store, check out possible fabrics for back LR window (didn’t complete this – will forward to next month)
  • Measure the space for the “hallway shelf/cabinet” project and diagram needed supplies (with measurements) (completed>
  • Purchase raw materials for “hallway shelf/cabinet” (completed>
  • Install “hallway shelf/cabinet” (completed when my folks were here)
  • Purchase the raw materials for the shelf/cabinet cover and the underside molding (completed 2/26/06)
  • Build & paint the cover for the hallway shelf/cabinet (completed: 2/28/06)
  • Build a radiator cover (completed 2/21/06 – built it with my Dad)
  • Assemble & paint old closet doors into new “screen” to hide storage area (completed when my parents were here)
  • Paint the hallway (Mostly completed when my parents were here… see below for remainder)
  • Cut in the corners/touch up (paint) in the hallway (completed: 2/28/06)
  • Hang the mirror and pictures in the hallway (completed: 2/28/06)
  • Paint the kitchen (moved forward)
  • Paint the front LR (Completed when my folks were here)

Comments are closed.