Things I will complete before 2/28/06
By 2/28/06 I will complete the following:
–Book Stuff–
–Acting Stuff–
Purchase Backstage on Thursday 2/2/06(completed: 2/3/06) – Did this Friday instead of Thursday.Send out headshots/resume for parts I’d be right for (week of 2/2/06)(didn’t complete this)
–Music Stuff–
Email C., re: get together on Thursday afternoon (2/2) for guitar hang(completed: 2/1/06) – update: This week’s no good for him. Possible follow-up next week. (update: 2/9/06) I got together with C. this afternoon.
–Home Stuff–
Follow up with apartment mgr., re: Credit(completed: 2/1/06) – I’ll get the credit on my March rent. It’s the credit I was expecting and I should be able to purchase the paint as well as a few other home items with it.Call the apartment mgr., re: Have them fix the toilet(completed 2/3/06) – The sewer and water guy came and took the tank apart and found the blockage. What a hoot.Call the super, set up appt. to hang the closet doors (completed 2/3/06) – He’s supposed to come first thing Monday morning.(update: 2/6/06) See my post here. Ridiculous.Paint the Burgundy wall(mostly complete: I put a couple of coats the burgundy wall but had issues with the paint. I need to wash off any dust on the wall and try another coat. Moving the completion of this one forward.)Touch up the remaining white areas that need it in the back LR(completed when my folks were here)Touch up (paint) the area around the back LR radiator(completed 2/28/06)Assemble the Expedit bookshelf(completed 2/4/06 – Thanks M.! : )Put the back LR furniture back where it belongs (out of the front LR)(completed)Research and find the best and/or cheapest raw materials for the “window framing” project(completed: 2/8/06)Purchase the raw materials for the window framing project(completed: 2/8/06)Assemble the “window framing” project (paint and attach the frames to window)(completed)Purchase a 3 foot display ledge for burgundy wall (probably from Pottery Barn)(move forward – I have a two foot ledge that I may or may not use. Will make a final decision before next weekend)Visit fabric store, check out possible fabrics for back LR window(didn’t complete this – will forward to next month)Measure the space for the “hallway shelf/cabinet” project and diagram needed supplies (with measurements)(completed>Purchase raw materials for “hallway shelf/cabinet”(completed>Install “hallway shelf/cabinet”(completed when my folks were here)Purchase the raw materials for the shelf/cabinet cover and the underside molding(completed 2/26/06)Build & paint the cover for the hallway shelf/cabinet(completed: 2/28/06)Build a radiator cover(completed 2/21/06 – built it with my Dad)Assemble & paint old closet doors into new “screen” to hide storage area(completed when my parents were here)Paint the hallway(Mostly completed when my parents were here… see below for remainder)Cut in the corners/touch up (paint) in the hallway(completed: 2/28/06)Hang the mirror and pictures in the hallway(completed: 2/28/06)Paint the kitchen(moved forward)Paint the front LR(Completed when my folks were here)